Interception & Diversion

Preparation of DPRs for Interception & Diversion of Schemes in Kohima under AMRUT 2.0

Government Client Directorate of Urban Development, Nagaland, Kohima
Project Description Preparation of DPRs for Interception & Diversion of Schemes in Kohima under AMRUT 2.0
Support provided by us
  1. 4 Nos. of natural drains carrying grey water and septic tank overflow
  2. Length and width of drains varies from 1 km to 4 km
  3. Topographical survey of major drains flowing in the Kohima town using DGPS and Total station
  4. Population projection and waste generation estimated for STP sizing
  5. Design standards using CPHEEO Manual and relevant IS Codes
  6. Site identification for proposed STPs
  7. 6 I&D structures and ancillary civil work proposed
  8. 4 Nos. of Sewage Treatment Plants proposed based on conventional technology which require minimum O&M
  9. Project also includes construction of retaining walls and Nalla training work
  10. Proposal includes sophisticated IOT and PLC-SCADA system for monitoring of technology and management of the system
  11. For minimizing the cost of electricity, Solar based system has also been included in the DPR
  12. Approach road of 5m of variable length as per requirement has also been proposed in the DPR.
  13. Landscape and architectural development is the integral part of the proposed scheme
  14. The waste generated i.e., sludge is proposed to be treated in nearby Solid Waste Management/ FSTP facilities as per standard process
  15. Civil, structure and E&M including Instrumentation design
  16. E&M and Instrumentation design and BOQ of proposed items from Market
  17. Preparation of Bill of Quantity and cost estimates using Nagaland Schedule of Rates, and Rate-Analysis carried out using Nagaland SOR and DSR (latest).
Technical detail
  1. 4 major drains tapped (length varies from 1km to 4km flowing in hilly region)
  2. 6 Nos. of I&D structures
  3. 4 Nos. of Sewage Treatment Plant (STP)
  4. Conventional treatment technologies for managing black-& grey-water flowing in drains
  5. IOT and PLC-SCADA technology
  6. Population projection for 2034
  7. rom Engineering College, PDMC and concerned department.
Kasganj I&D Scheme under Namami Gange Scheme
Government Client UP Jal Nigam
Contractor Eco-Deeds
Project description Interception and diversion work and STP at Kasganj, UP. Presently, there is no sewerage system in Kasganj, the wastewater is discharged into open drains which finally meet River Kali and contribute to pollution of the river.
Support provided by us Design engineering of: (a) Hydraulic design of gravity line (Interception & diversion) of natural drain collecting wastewater, (b) bedding design, (c) civil & structural design of box drain, (d) condition assessment of different sections, (e) designing of rising/ pumping main, (f) Civil, structural, E&M and Instrumentation design of MPS
Technical detail
  1. Nalla tapping arrangement with structures for special manhole (collection chamber for sewage from 2 existing Nalla)
  2. Length – 3 km.
  3. Dia. – 500-800 mm.
  4. Layout plan, X-Section, L-Section.
  5. MPS – 15 MLD (design – civil, E&M and instrumentation).
  6. Disposal line – 800 mm.
  7. Coordination for design approval from Engineering College, PDMC and concerned department.
Etawah I&D Scheme under Namami Gange Scheme
Government Client UP Jal Nigam
Contractor Eco-Deeds
Project description Interception and diversion work and STP at Etawah, UP. Interception and diversion of Tixi Nala, upgradation of existing STPs including chlorination systems and a new STP of 21 MLD sewage treatment capacity and online monitoring system of 3 STPs.
Support provided by us Design engineering of: (a) Hydraulic design of gravity line (Interception & diversion) of natural drain collecting wastewater, (b) bedding design, (c) civil & structural design of box drain, (d) condition assessment of different sections, (e) designing of rising/ pumping main, (f) Civil, structural, E&M and Instrumentation design of MPS
Technical detail
  1. Nalla tapping arrangement with structures for special manhole (collection chamber for sewage from STP – Disposal line)
  2. Length – 2 km.
  3. Dia. – 1000 mm.
  4. Layout plan, X-Section, L-Section.
  5. MPS – 60 MLD (design – civil, E&M and instrumentation).
  6. Disposal line – 800 mm.
  7. Coordination for design approval from Engineering College, PDMC and concerned department.
Budhana I&D Scheme under Namami Gange Scheme
Government Client UP Jal Nigam
Contractor Eco-Deeds
Project description Interception and diversion work and STP at Budhana, UP. Construction of 10 MLD STP with associated infrastructure like construction of one main pumping station (MPS), construction of three interception and diversion (I&D) works, laying of 800 mtr of I&D network, laying of 200 mtr rising main and laying of disposal line.
Support provided by us Design engineering of: (a) Hydraulic design of gravity line (Interception & diversion) of natural drain collecting wastewater, (b) bedding design, (c) civil & structural design of box drain, (d) condition assessment of different sections, (e) designing of rising/ pumping main, (f) Civil, structural, E&M and Instrumentation design of MPS
Technical detail
  1. Nalla tapping arrangement with structures for special manhole (collection chamber for sewage from 3 existing Nalla)
  2. Length – 1 km.
  3. Dia. – 500-600 mm.
  4. Layout plan, X-Section, L-Section.
  5. MPS – 22.5 MLD (design – civil, E&M and instrumentation).
  6. Coordination for design approval from Engineering College, PDMC and concerned department.